Check out our latest news below
Another project completed by the LDH Solutions Ltd team.
We have recently completed a high-level LED lighting upgrade at a busy commercial transport site, improving the lighting across trailer park and container base areas.
Following a lighting survey, lux level assessment and LED lighting design, we carried out the upgrade to improve visibility, safety and energy efficiency across the site.
One of the main challenges was that the existing high mast lighting towers could not be lowered, so our team had to access the fittings at approximately 35 metres using specialist high-level MEWP equipment.
The works included:
• Removing the existing discharge floodlighting
• Installing new LED floodlights and luminaires
• Fitting new brackets and high-level fixings
• Testing the existing cabling for suitability
• Working safely at height while keeping disruption to site operations as low as possible
This is a great example of the type of commercial and industrial electrical work LDH Solutions Ltd can deliver, from survey and design through to installation, testing and handover.
Well done to everyone involved.
#LDHSolutions #LEDLighting #CommercialElectrical #IndustrialElectrical #LightingUpgrade #WorkingAtHeight #MEWP #ElectricalContractor #FacilitiesManagement

Today we’ve had Paxton Access training at our Leeds office, focusing on Net2 access control systems.
The session covered the full process, from installation and commissioning through to software setup and day-to-day system management.
It was a great opportunity for the team to sharpen their knowledge and make sure we continue delivering reliable, well-set-up access control systems for our commercial and industrial customers.
A big thank you to Paxton for supporting us with the training.
#Paxton #Net2 #AccessControl #SecuritySystems #ElectricalContractors #LDHSolutions #Leeds #CommercialElectrical

Keeping businesses powered, safe and compliant.
This week we’ve been out carrying out a mix of commercial and industrial electrical works, including LED lighting upgrades, power and data installations, EICR testing, PAT testing, domestic testing and access control installations.
At LDH Solutions Ltd, we support businesses with reliable electrical, fire, security and compliance services across Yorkshire and beyond.
Whether it’s a planned upgrade, testing and inspection, or ongoing maintenance, we’re here to help keep your site running safely and efficiently.
📍 Commercial & Industrial Electrical Contractors
⚡ NICEIC Approved Contractor
✅ SafeContractor Accredited
🔐 Paxton Access Silver Partner
www.ldh.solutions
#LDHSolutions #ElectricalContractor #CommercialElectrician #IndustrialElectrician #LEDLighting #EICR #PATTesting #AccessControl #FireAlarm #EmergencyLighting #CCTV #YorkshireBusiness #FacilitiesManagement #PropertyManagement #Compliance #NICEIC #SafeContractor
A busy week for the LDH Solutions Ltd team.
This week we’ve been working across a real mix of electrical and compliance projects, including:
✅ LED lighting upgrades at 40m high
✅ Power and data installation for an office in Harrogate
✅ EICR testing for an industrial customer in Manchester
✅ Domestic EICR testing
✅ PAT testing
✅ Access control installations
It’s a good example of the range of work we carry out, from planned electrical upgrades and compliance testing through to data, security and access control systems.
Whether it’s a commercial site, industrial premises, office, landlord property or domestic installation, we can help keep things safe, compliant and working as they should.
If you need support with electrical installations, EICRs, lighting upgrades, PAT testing, data cabling or access control, give us a call and we’ll be happy to help.
📞 Leeds: 01138 98 20 20
📞 Bradford: 01274 22 90 30
#ElectricalContractor #EICR #LEDLighting #PATTesting #AccessControl #DataCabling #CommercialElectrical #IndustrialElectrical #Harrogate #Manchester #Leeds #Bradford #LDHSolutions

Another quality installation completed by LDH Solutions Ltd.
We recently supplied, installed and integrated a new Schneider 15 kVA three phase UPS system at Oval Insights, providing resilient backup power to their essential distribution board.
The existing UPS bypass arrangement meant the critical supplies could remain live from raw mains while the new UPS was installed, helping reduce disruption and allowing the final changeover to be carried out in a controlled manner.
The new system was sized to provide approximately 20.5 minutes runtime at 11.25 kW, with long-life battery modules designed to reduce future battery replacement frequency. The selected Schneider configuration also allowed the battery strings to be housed within the UPS cabinet, avoiding the need for a separate battery enclosure, additional DC cabling and unnecessary floor space.
Our works included:
• Installation of the new Schneider 15 kVA UPS
• Integration with the existing maintenance bypass arrangement
• Installation of backfeed protection, battery strings and network management card
• New AC and DC cabling
• Pre-energisation testing and checks
• Manufacturer start-up and commissioning support
• Functional testing in normal, battery and bypass modes
• Labelling, certification and NICEIC documentation
A tidy, well-planned installation giving the client confidence that their essential equipment now has proper UPS-backed resilience in place.
Great work by the team.
#LDHSolutions #ElectricalContractor #UPSInstallation #SchneiderElectric #CriticalPower #PowerResilience #CommercialElectrical #NICEIC #ElectricalInstallation #FacilitiesManagement
Great to see another job completed by the LDH Solutions Ltd team, this time at the new Hill Dickinson Stadium, within the Everton Stadium Club Shop.
We were asked to provide new power and data installations for the “My Moments” terminal locations, which will help support the customer experience inside the club shop.
Our works included the installation of new socket outlets and data points at both ground floor and first floor level, carefully planned to suit the exposed services style of the building.
The installation was completed using:
⚡ Metal clad twin socket outlets
📡 New single data outlet positions
🔩 Galvanised conduit and containment drops
🧰 Surface mounted installation to match the existing site aesthetic
✅ Electrical testing and certification on completion
A key part of this job was making sure the new installation blended in properly with the surroundings. With the club shop having an exposed services finish, the detail mattered. Galvanised containment, neat conduit drops and metal clad accessories were used to keep the final installation looking consistent with the rest of the building.
The data works also involved making use of existing high-level containment routes where possible, along with reusing and relocating suitable redundant data cabling identified during the survey. This helped keep the installation practical, tidy and efficient without unnecessary disruption.
It is always good to be involved in projects where the small details still matter, especially in such a high-profile venue.
Well done to everyone involved.
#LDHSolutions #ElectricalContractor #DataInstallation #EvertonStadium #HillDickinsonStadium #CommercialElectrical #PowerAndData #Containment #ElectricalInstallation #ClubShop

Happy St George’s Day from all of us at LDH Solutions Ltd.
Here’s to hard work, pride in what we do, and keeping Britain powered safely and reliably every day.
#StGeorgesDay #ElectricalContractors #LDHSolutions #PoweringBritain
Happy Easter from all of us at LDH Solutions 🐣
Whether you’re taking five or still keeping things running, hope you’ve got a proper good weekend.
If anything trips, pops, or packs in… we’re only a call away (but hopefully it stays egg-stra quiet).

Shopfitting needs more than just electricians. It needs a team that understands the full fit out.
At LDH Solutions Ltd, we support shopfitting and retail projects with electrical distribution, power, lighting, data, access control and fire alarm installations, all delivered with safety, quality and programme in mind.
We’re proud of the work our team puts in on site and the standards they maintain from start to finish.
#LDHSolutions #Shopfitting #ElectricalContractor #RetailFitOut #CommercialElectrical

Another project successfully completed at Salford City Academy by the LDH Solutions team. This one included the removal of the existing lighting, installation of new LED lighting and emergency lighting, new stainless steel floor sockets within the tiered seating, cable management, power supplies, and the installation of interactive screens. All works were tested, certified and handed over on completion. A tidy finish and another job delivered. 💡⚡🖥️
#LDHSolutions #ElectricalContractors #CommercialElectrical #SchoolRefurbishment #EducationSector #LEDLighting #EmergencyLighting #InteractiveScreens #ElectricalInstallation #PowerAndLighting #TieredSeating #CertifiedAndTested #ProjectComplete #UKConstruction #ElectriciansOfInstagram
Business is picking up across West Yorkshire and we are expanding our team.
We are keen to connect with experienced Approved Electricians and Electricians who take pride in their work, communicate well on site, and can represent our company professionally.
Work includes commercial and industrial installations, upgrades, testing and project support.
If you are interested in working alongside a busy, well organised contractor with consistent projects, send your details to hello@ldh.solutions
Valentine’s Day feels like a good excuse to say thank you.
To our engineers and office team for the graft you put in,
to our suppliers who keep us moving,
and to our customers who trust us with their projects.
We appreciate you all.
Happy Valentine’s Day from LDH Solutions ❤️⚡

Kicking off a new project at a school in Manchester ⚡
We’re installing new lighting, power for tiered seating, interactive screens and data throughout the space.
All about safe, tidy installs and making sure the rooms are set up properly for modern teaching and learning.
Plenty more to come as the job moves on 🔧
#SchoolProjects #EducationElectrical #CommercialElectrical #LEDLighting #DataCabling InteractiveScreens ManchesterProjects ElectricalContractor OnSite SparkyLife BehindTheScenes
We’ve added a Projects page to our website so you can see the sort of work we’re doing across commercial and industrial sites, from lighting upgrades to power and compliance works. We’ll be updating it frequently with new jobs and photos as we go.
Have a look through and if you’ve got something similar coming up, give us a shout.
https://www.ldh.solutions/our-projects
#LDHSolutions #ElectricalContractor #CommercialElectrical #IndustrialElectrical #WarehouseLighting #LEDHighBay #LightingUpgrade #ElectricalInstallation #FacilitiesManagement #BuildingServices #SiteWork #ProjectShowcase #WestYorkshire #YorkshireBusiness #UKIndustry

Started a distribution board upgrade today for one of our clients.
It’s a tight turnaround with a Monday morning deadline, so planning, coordination, and experience really come into play on jobs like this.
Proud of the team for hitting the ground running. Looking forward to sharing the finished result once we’re powered back up and signed off.
#CommercialElectrical #ElectricalUpgrades #DistributionBoards #ProjectDelivery #ElectricalContractors #LDHSolutions #PowerInfrastructure

Morning from LDH Solutions ☕
Vans are loaded, flasks are full, and the diary’s looking… well… lively 😅
Big thanks to everyone keeping us busy. Right, let’s crack on.
November has been a busy one for the LDH Solutions team 💥
This month we have:
• Completed more commercial EV charger installations, including new distribution boards to support them ⚡
• Installed a new 250A distribution board for forklift chargers at a client in Wakefield
• Upgraded a consumer unit for a long standing domestic client in Leeds 🏡
• Carried out multiple servicing visits to our previous EV charger installations to keep everything running safely and efficiently
• Kept on top of general statutory compliance and planned preventative maintenance visits across our client sites ✅
Big thanks to our engineers and our clients
If you are looking at EV charging, distribution upgrades or general electrical maintenance, get in touch and we will be happy to help.
At 11:00 today we’ll pause for two minutes to remember all who served and those who gave their lives. We will remember them.
#RemembranceSunday #TwoMinuteSilence #LestWeForget

Fresh 200A board in, 4 x 22 kW chargers live, Monta running the back office.
Clean install. Simple to use. Happy Friday from the team.
#EVCharging #Monta #EVReady #SustainableTransport #GreenFleet #ElectricalInstallations #Yorkshire #UKBusiness
Bonfire Night is brilliant, but electrics need a quick check. Use RCD protection, keep cables dry and lifted, avoid daisy-chaining, and set up well away from overhead lines. Running a display or catering?
We can spec safe temporary power and emergency lighting checks. Message LDH Solutions and we’ll sort it.